Processing...
Processing...
Inmagic
®
Presto
Version 5.5 Build 151
Inmagic
®
Presto
Copyright © 2005-2021 by Lucidea Technologies Corp., Richmond BC Canada. All rights reserved.
Inmagic® and the Inmagic logo are registered trademarks of Lucidea Technologies Corp.
Unauthorized duplication or distribution is prohibited.
Other brand and product names are trademarks or registered trademarks of their respective holders. Use of any other product name does not imply endorsement of that product by Inmagic.
Third-party Licenses
Processing...
Processing...
Title
Life extension of aging railway bridges: a case study of the Burnett River Bridge
Author
Kandadai, R (Jacobs SKM)
Gillespie, S (Jacobs SKM)
Emslie, R (Jacobs SKM)
Lark, P (Jacobs SKM)
Woltmann, T (Queensland Rail)
Abstract
The North Coast Rail Line in Queensland between Bundaberg and Gladstone has three major crossings over the Burnett, Kolan and Boyne Rivers. The bridges were constructed in the 1890’s using cast iron piers and through girder spans. Queensland Rail Network Pty Ltd identified significant deterioration in the cast iron piers and placed speed restrictions on two of the bridges. In 2009 Jacobs SKM were engaged to undertake a detailed study to determine whether it was feasible to repair and maintain the bridges in service or whether they should be replaced. The paper describes the methods adopted to establish the current load rating of the bridges, i.e., the strength capacity to withstand the maximum load applied by the QR rating vehicle. In addition, the paper describes the measures that have been recommended to prevent further deterioration of the cast iron piers and to improve the capacity of the bridge piers to withstand train braking loads. A comprehensive program of materials testing, finite element analysis, and load testing of the Burnett River Bridge was carried out and will be discussed in the paper. The study recommended the adoption of an innovative system of hydraulic “lock-up” devices to transfer train braking loads from the more heavily loaded piers to other piers, and the application of carbon fibre wrapping to regain the pier strength that has been reduced by corrosion. These modifications will enable the bridge to remain in service for a further 25 to 30 years.
File - click thumbnail to download
Notes
Full text paper courtesy of Austroads
Document type
Conference paper
Conference or Journal
Austroads Bridge Conference, 9th, 2014, Sydney, New South Wales, Australia
Date published
2014
Number
5.3
Pagination
19p
Subject
Railway track
Bridge maintenance
Bridge management
Corrosion
Load
Life cycle assessment
Publisher
ARRB Group Ltd