Processing...
Processing...
Inmagic
®
Presto
Version 5.5 Build 151
Inmagic
®
Presto
Copyright © 2005-2021 by Lucidea Technologies Corp., Richmond BC Canada. All rights reserved.
Inmagic® and the Inmagic logo are registered trademarks of Lucidea Technologies Corp.
Unauthorized duplication or distribution is prohibited.
Other brand and product names are trademarks or registered trademarks of their respective holders. Use of any other product name does not imply endorsement of that product by Inmagic.
Third-party Licenses
Processing...
Processing...
Title
Formation of the Pilbara railways
Author
Gurney, J
Affiliation
Pilbara Railway Company
Publication Date
2002-10-11
Conference
Permanent Way Institution (PWI) NSW 2002 Annual Convention: Railways - Sweating the Asset
Abstract
The Pilbara Railway Co. was formed on the 01/04/02 so the Hamersley Iron and Robe River Railways could be operated as one organisation and therefore deliver improved efficiencies to both Hamersley and Robe. The combined railways have a total track length of approximately 1100kms, which now services 7 mines [Tom Price, Paraburdoo, Brockman, Yandicoogina, West Angelas, Deepdale, Marandoo]. There are 4 car dumpers, 2 at Cape Lambert [1 single cell and 1 dual cell] and at Dampier there are 2 dual cell units [Parker Pt and East Intercourse Island]. There are a total of 3600 wagons, 35 Dash 9 Locomotives, 12 Dash 8 Locomotives, and 3 Alco Locomotives on site. The two railways were connected in March 2002, 71 kms from Cape Lambert and 78kms from Dampier by a 5.3km track called the Western Creek link. At the same time a 60km spur was constructed from the 363km Hamersley Iron Yandicoogina Branch line [Juna Downs.] to the West Angelas mine site in 7 weeks. West Angelas is 425km from Dampier/Cape Lambert. There is another 48kms of track duplication to construct [from Gull at the 105 km - Tunkawanna at the 153km.]. This work has just commenced and will be completed by the 31/03/2003. A new VAE Kinematic Gauge Optimisation [KG0] 1:20 Tangential Turnout is to be installed at the 153km on the Hamersley Iron line as part of this project. There are now a total of 319 turnouts in the network. These are made up of 1:8, 1:10, 1:12, 1:15, 1:20 A.R.E.A. and 1:20 1000m and 300m radius VAE Tangential turnouts. All of the 1:2Ds, 1:15s, 1:12s and 1:1Ds on the mainlines are on concrete and some of the 1:12s and 1:10s in the yards are also on concrete. Most of the Robe Turnouts in the yards are 1:10s with some 1:8s. All of the Robe turnouts have Sampson points whereas at Hamersley, most turnouts use a knife-edge stock rail and blade assembly. The majority of the Hamersley turnouts in the yards are 1:12s with some 10s and 8s. There are a total of 81 Swing Nose Frogs in operation throughout the system. One of these frogs has rollers incorporated under the tongue, to remove the need for lubrication.
File - click thumbnail to download
Physical Description
6p. ; PDF
Subjects
Mining
Rail transport
Railway track
Infrastructure
Location
Server
ARRB library
Category
Rail Conferences
PWI (Permanent Way Institution)
Annual Convention 2001 - 2010
Rail Knowledge Bank Index
Infrastructure
Rail Knowledge Bank Index
Infrastructure
Track
Permalink
https://railknowledgebank.com/Presto/pl/MTk4MTRjNDUtNWQ0My00OTBmLTllYWUtZWFjM2U2OTE0ZDY3LjQ2MTU=